{"id":16331,"date":"2017-03-16T19:54:17","date_gmt":"2017-03-16T16:54:17","guid":{"rendered":"https:\/\/tekniktempo.com.tr\/?p=16331"},"modified":"2018-03-05T18:29:31","modified_gmt":"2018-03-05T15:29:31","slug":"erzincan-kars-kis-turizm-koridorunu-gelistirme-projesi-musavirlik-hizmetleri","status":"publish","type":"post","link":"https:\/\/tekniktempo.com.tr\/en\/2017\/03\/16\/erzincan-kars-kis-turizm-koridorunu-gelistirme-projesi-musavirlik-hizmetleri\/","title":{"rendered":"Erzincan-Kars Winter Tourism Corridor Development Project Consultancy Services"},"content":{"rendered":"<p>[vc_row row_type=&#8221;row&#8221; use_row_as_full_screen_section=&#8221;no&#8221; type=&#8221;full_width&#8221; angled_section=&#8221;no&#8221; text_align=&#8221;left&#8221; background_image_as_pattern=&#8221;without_pattern&#8221; css_animation=&#8221;&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<\/p>\n<table width=\"100%\">\n<tbody>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\" valign=\"top\" width=\"20%\"><b>Year<\/b><\/td>\n<td style=\"height: 24px;\" valign=\"top\" width=\"1%\"><b>:<\/b><\/td>\n<td style=\"height: 24px;\" valign=\"top\" width=\"79%\">2015 &#8211; Continues<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\" valign=\"top\" width=\"20%\"><b>Location<\/b><\/td>\n<td style=\"height: 24px;\" valign=\"top\" width=\"1%\"><b>:<\/b><\/td>\n<td style=\"height: 24px;\" valign=\"top\" width=\"79%\">Erzincan &#8211; Kars &#8211; Turkey<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\" valign=\"top\" width=\"20%\"><b>Client<\/b><\/td>\n<td style=\"height: 24px;\" valign=\"top\" width=\"1%\"><b>:<\/b><\/td>\n<td style=\"height: 24px;\" valign=\"top\" width=\"79%\">Ministry of Science and Industry, Department of EU Investments<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\" valign=\"top\" width=\"20%\"><b>Financed by<\/b><\/td>\n<td style=\"height: 24px;\" valign=\"top\" width=\"1%\"><b>:<\/b><\/td>\n<td style=\"height: 24px;\" valign=\"top\" width=\"79%\">European Union and Republic of Turkey (MoSIT, MoCT)<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\" valign=\"top\" width=\"20%\"><\/td>\n<td style=\"height: 24px;\" valign=\"top\" width=\"1%\"><\/td>\n<td style=\"height: 24px;\" valign=\"top\" width=\"79%\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>[\/vc_column_text][vc_column_text]<b>Main Project Features :<\/b><\/p>\n<p>The Consultancy Services Contract covers the pre-construction, construction and post-construction (maintenance-operation and Defect-Liability) controls of construction works under FIDIC Red Book conditions. The leading company is Teknik Tempo A\u015e.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;16534&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; qode_css_animation=&#8221;&#8221;][vc_single_image image=&#8221;16535&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; qode_css_animation=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row row_type=&#8221;row&#8221; use_row_as_full_screen_section=&#8221;no&#8221; type=&#8221;full_width&#8221; angled_section=&#8221;no&#8221; text_align=&#8221;left&#8221; background_image_as_pattern=&#8221;without_pattern&#8221; css_animation=&#8221;&#8221;][vc_column][vc_column_text]<strong>Construction Contract;<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>The contract covers two regions (LOTs)<\/p>\n<p>LOT 1) \u00a0Erzincan-Ergan Mountain Tourism Facilities Infrastructure<\/p>\n<p>At the first stage, the target is the year of 2025 and 6250 people will be made for the population:<\/p>\n<ul>\n<li>Drinking Water System: 14 km drinking water transmission line and distribution network, 1 main water storage and 3 water intake structures<\/li>\n<li>Waste Water System (Design and Build): 8 km wastewater collector and main line, 22 manholes, wastewater treatment facility (biological package treatment, field lighting, sludge dewatering, energy transformer and generator units)<\/li>\n<\/ul>\n<p>LOT 2 ) Kars-Sar\u0131kam\u0131\u015f Tourism Area Infrastructure<\/p>\n<p>At the first stage, the target is the year of 2025 and 8250 people will be made for the population:<\/p>\n<ul>\n<li>Wastewater System (Design-Build): 12 km wastewater collector and mains line, 233 manholes,<\/li>\n<li>Wastewater treatment facility (biological treatment, field illumination, sludge dewatering, energy transformer and generator units)<\/li>\n<li>Landscape (Construction): The construction of a square in front of the accommodation facilities on the mountain of Ci\u011filtepe and the stone pavement, ladders, retaining walls, irrigation system, lighting works<\/li>\n<li>Social Facilities (Buildings): Buildings that are used daily and consist of cafes, shops and WCs (2 blocks)<\/li>\n<\/ul>\n<p>Construction works are still in progress according to the program.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>","protected":false},"excerpt":{"rendered":"<p>[vc_row row_type=&#8221;row&#8221; use_row_as_full_screen_section=&#8221;no&#8221; type=&#8221;full_width&#8221; angled_section=&#8221;no&#8221; text_align=&#8221;left&#8221; background_image_as_pattern=&#8221;without_pattern&#8221; css_animation=&#8221;&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text] Year : 2015 &#8211; Continues Location : Erzincan &#8211; Kars &#8211; Turkey Client : Ministry of Science and Industry, Department of EU Investments Financed by : European Union and Republic of Turkey (MoSIT, MoCT) [\/vc_column_text][vc_column_text]Main Project&#8230;<\/p>\n","protected":false},"author":2,"featured_media":16534,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"sfsi_plus_gutenberg_text_before_share":"","sfsi_plus_gutenberg_show_text_before_share":"","sfsi_plus_gutenberg_icon_type":"","sfsi_plus_gutenberg_icon_alignemt":"","sfsi_plus_gutenburg_max_per_row":"","footnotes":""},"categories":[149,147],"tags":[158],"_links":{"self":[{"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/posts\/16331"}],"collection":[{"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/comments?post=16331"}],"version-history":[{"count":11,"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/posts\/16331\/revisions"}],"predecessor-version":[{"id":16761,"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/posts\/16331\/revisions\/16761"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/media\/16534"}],"wp:attachment":[{"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/media?parent=16331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/categories?post=16331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tekniktempo.com.tr\/en\/wp-json\/wp\/v2\/tags?post=16331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}