16 Mar Antalya Organized Industrial Zone 3rd Extention Region Infrastructure Projects
Year | : | 2014 – 2014 |
Location | : | Antalya – Turkey |
Client | : | Antalya Industial Organized Zone |
Financed by | : | Antalya Industial Organized Zone |
Definition of Engineering Services:
Tempo Altyapı had previously prepared infiastructure desing for the 1st and 2nd expansion areas of 270 ha within Antalya Organized Industrial Zone, The 3rd stage of expansion of 42 ha was olso awatded to Teknik Tempo.
Scope of contract:
Preparation of designs Bills of Quantities of Main distribution lines for drinking (4065m), waste water (6285m) and stormwater drainage (4175m) networks, wastewater pumping station, service roads (3142m), MV line (17km) and LV line (4095m) and indoor and outdoor lighting systems and specifications.
The services within the contract were completed on time.
Sorry, the comment form is closed at this time.