16 Mar Merzifon Water and Wastewater Project Technical Assistance and Supervision Services Contract
Year | : | 2015 – Continues |
Location | : | Merzifon – Turkey |
Client | : | Ministry of Environment and Urbanizm Department of EU Investments |
Financed by | : | European Union and Republic of Turkey (MoEU, Municipality) |
Technical Assistance and Consultancy Services;
1-Technical Assistance and Capacity Development (Water-Channel Directorate-Programs for Project Implementation Unit)
- Institutional and Operational Analysis Gap analysis, Determination of Training Needs, Capacity Development Program and financial and operational performance improvement plan in this context, increasing management skills of personnel, proposing a new organizational structure,
- Technical assistance and capacity building and support for the preparation of GIS use, preparation of water and wastewater networks digital maps, report on drinking water loss and leakage prevention and report on loss and leakage prevention, and report on non-revenue water consumption, support for hydraulic modeling of drinking water system, education,
- Water Resources Conservation Plan
- Sludge Management Plan,
- Development of methodologies and procedures
2- Support for Equipment Procurement;
The need report, the tender dossier, the lost and leak detection device in the procurement process and after the bidding process, the closed circuit (CCTV) sewer inspection tool, the channel cleaning tools, etc.
3- Rehabilitation of exisling water supply system and distibution network ( Contract -2 )
Implementation of site investigation, preparation of design and tender dossier for 26km main lines and support during tender and supervision, ( This Component is cancelled before tender plase)
4-Consraction Supervision Services
Contract 1: Wastewater Treatment Plant Construction (FIDIC Yellow Book)
Construction Company | : | GEZER Endüstri İnşaat AŞ |
Contract signing date | : | 30.12.2015 |
Commencement date | : | 26.01.2016 |
Total Duration | : | 540 days + 365 days |
Completion Date | : | 19.07.2017 |
Final acceptance date | : | 18.07.2018 |
Within the scope of the project, the control of the construction work including the design of the wastewater treatment plant, which has an average output of 12,816 m3 / day and will serve until 2040, and training on operation and maintenance of the staff of Merzifon Municipality.
Contracting Authority : Ministry of Envirenment in the and Urbanisation Deparment of EU Investments
Sorry, the comment form is closed at this time.