Wastewater Management

16 Mar Şanlıurfa Wastewater Treatment Plant and Wastewater Collector Renovation Project Consultancy Services

Year : 2016 – Continues
Location : Şanlıurfa – Turkey
Client : Ministry of Environment and Urbanizm Department of EU Investments
Financed by : European Union and Republic of Turkey (MoEU, Municipality)

Scope of the Consultancy Services Contract;

1- Technical Assistance and Capacity Municipalities / Programs for WUD and Project

  • Institutional and Operational Analysis Gap analysis, Determination of Training Needs, Capacity Development Program and financial and operational performance improvement plan in this context, increasing management skills of personnel, proposing a new organizational structure,
  • Technical assistance and capacity building and support for the preparation of GIS use, preparation of water and wastewater networks digital maps, plan report for drinking water loss and leakage detection and loss and leakage prevention report and non-revenue water consumption, support for hydraulics modeling of drinking water system and all works For education,
  • Water Resources Conservation Plan
  • Sludge Management Plan,
  • Development of methodologies and procedures

2- Support for Equipment Procurement

The need assessment report and the price investigation report, the preparation of the tender file, the loss and theft detection device, the closed circuit (CCTV) sewer inspection tool, the channel cleaning tools, etc. during and after the tender process.

3- Construction Supervision Services

The scope of the project includes the design and construction of a wastewater treatment plant with an average of 145,000 m3 / day, which will serve until 2030, and operation and maintenance training for the staff of ŞUSKI and operation and maintenance works during the Defect Accountability period.

Within the scope of the project, Karaköprü wastewater collector (approximately 12 km 400 m 2 and 160 m 1600 mm concrete pipeline), Yenice-Tarımkent Collector (2.6 km 800 mm concrete pipe line), Dağeti Collector (approximately 7 km 1000 mm ‘ And 1200 mm concrete pipelines) and operation and maintenance works during Defect Accountability.

No Comments

Sorry, the comment form is closed at this time.

Follow by Email
Twitter
Visit Us
Follow Me
LinkedIn
Share
Instagram