16 Mar Sanliurfa Cotton Exchange Licensed Warehouse Project and Consulting Services
Year | : | 2014 – Continues |
Location | : | Şanlıurfa – Turkey |
Client | : | Ministry of Science and Industry, Department of EU Investments |
Financed by | : | European Union and Republic of Turkey (MoSIT, TOBB) |
Main Project Features :
The Consultancy Services Agreement covers supervision services for the construction and equipment installation in accordance with the FIDIC Red Book conditions, including pre-construction, construction and post-construction (maintenance-operation and defects liability) and equipment procurement contracts.
Within the scope of the project there is an area within the boundaries of the 2nd OIZ and a width of 117.2; (4 * 4800 m2 = 19.200 m2), Gölgelik (2.560 m2), Administration Building (3.352 m2), roads, infrastructure, retaining walls, lighting, transformer and energy transmission Lines and other facilities.
In addition, technical assistance is provided in the equipment procurement contract. Accordingly, it is planned to sign the contract with the Supplier Company on December 2016 and to complete the work within 165 days. In this context, laboratory equipment, sampling equipment, carrier equipment and information processing equipment will be provided for installation and testing.
Construction work has been completed, provisional acceptance are released. The project is at the stage of final accepti
The works in the Procurement Agreement have not been realized yet.