Solid Waste Management

19 Mar Erzurum Solid Waste 2nd Stage Design and Consultancy Services

Year : 2013 – 2014
Location : Erzurum – Turkey
Client : Erzurum Metropolitan Municipality
Financed by :  Erzurum Metropolitan Municipality

Scope of contract;

Preparation of 2 nd Stage (Extension) Design and Tender Dossier of Solid Waste Facility

Scope of Project: In the second storage area of 910.000 m3 waste capacity to be used until 2020; Basin geotextile impermeable cover, transmission lines for collection of leachate and disposal at the existing leachate treatment plant, rainwater drainage system and asphalt coating service road and environmental lighting works.

TEMPO wad implemented the design and construction supervision of the 1st Stage Solid Waste Storage Facility financed by KfW between 2004-2007 as a consortium member.